The following letter was sent to the Ministers below (and the media) on March 16, 2011.



Linda Jeffrey
Minister of Natural Resources
Whitney Block, 6th Floor, Room 6630
99 Wellesley Street West
Toronto, ON  M7A 1W3
416 314-2301
LJeffrey.mpp.co@liberal.ola.org

Brad Duguid
Minister of Energy and Infrastructure
Hearst Block, 4th Floor
900 Bay Street
Toronto, ON  M7A 2E1
416 327-6758
BDuguid.mpp.co@liberal.ola.org

The Honourable John Wilkinson
Minister of the Environment
77 Wellesley Street West
11th Floor, Ferguson Block
Toronto, ON  M7A 2T5
416 314-6790
minister.moe@ontario.ca

Dear Ministers,

As for a doctor, an engineer’s first responsibility is to “do no harm”, and this includes examining risks.

Unfortunately, the proponents for the proposed hydro-electric power station at the Bala Falls have not addressed the risk of possible damage to the north dam – which would be less than 65′ from the blasting required to excavate a 60′-deep trench into the Muskoka bedrock. A dam failure would be disastrous, as Lake Muskoka is 120 km2 in area, and is 20′ higher than the Moon River, which is heavily used for in-water recreation and has residences on both sides. Accordingly, we have sent the letter below to the Ministry of the Environment.

We have posted other unaddressed safety, tourism, and economic concerns at http://SaveTheBalaFalls.com

———————————————————-

Mitchell Shnier, on behalf of SaveTheBalaFalls.com
25 Lower Links Road
Toronto, ON  M2P 1H5

Telephone: 416 222-1430
E-mail: Mitchell@Shnier.com

——————————————————————————————

———- Forwarded message ———-
From: Mitchell Shnier <Mitchell@shnier.com>
Date: Mon, Mar 14, 2011 at 5:50 PM
Subject: Dam Safety for Proposed Hydro-electric Generating Station at the Bala Falls
To: “Adam Sanzo (ENE)” <Adam.Sanzo@ontario.ca>
Cc: michael.harrison2@ontario.ca

Hello Mr. Sanzo, 

Dam Failure

It has come to our attention that the work required to construct the proposed hydro-electric power station at the Bala falls should trigger a public safety assessment. Such requirements are in draft documents from the Canadian Dam Association and the Ministry of Natural Resources.

This would be prudent, given that the proposed project would involve rock blasting down 60′ within 65′ of the north dam – which is over 50 years old.

Given that the water level of Lake Muskoka is 20′ higher than the Moon River, and given the huge 120 km2 area of Lake Muskoka, a Bala dam failure would be catastrophic; to people and structures downstream, to boats and marine life upstream, and to the proponent’s finances.

According to the draft “Technical Guidelines and Requirements for Approval Under The Lakes & Rivers Improvement Act, Volume Three – Life Cycle Management of Dams”, Chapter 2, Section 2.2.3, this situation would be classified as “High Hazard Potential”.

Therefore, information is required from the proponent concerning:

  • A risk assessment of what could happen, what areas would be affected, how these risks would be controlled, and what level of risk is acceptable.
  • What steps would or could be taken to ensure the dam structure is not damaged.
  • How the dam’s integrity would be monitored during and after blasting.
  • The roles and responsibilities of each involved party, in the event of an emergency. This would be especially important, given the complex arrangement of the dam owner, the developer, the contractor, the dam operator, and the various levels of government.
  • Insurance requirements and liability of each involved party.

Control System Failure
Furthermore, given the large flow capacity of the proposed power station (of perhaps 79 m3/s), as the plant’s control system could fail, the following should be documented:

  • How the operator would be alerted of a failure (what failures would be automatically alterted, how would the public be able to contract the operator).
  • The capability, steps, and time required to manually shut down the flow given a failure of one or more of each component (such as the control electronics, the control valves, or their actuators).

Conclusion
While Section 2.1.6.1 of the proponent’s environmental screening report notes that a Dam Safety Assessment was performed in 2000, this only considered flooding due to high flow events, not dam failure – and this Assessment certainly did not consider the possiblity of failure due to the proposed nearby rock blasting.

These are fundamental science-based, technical, public property, and public safety issues which need to be considered as part of evaluating this proposed project.

As this information has not been provided by the proponent, we therefore request that this project be elevated to an individual environmental assessment so that these serious issues can be properly addressed.

Thank you.

—————————————————————————————-
Mitchell Shnier, on behalf of SaveTheBalaFalls.com
25 Lower Links Road
Toronto, ON  M2P 1H5

Telephone: >416 222-1430
E-mail: Mitchell@Shnier.com