May 282014
The proponent’s 2012 Environmental Assessment Addendum provided an outline of their proposed Alternative 1A generating station. As shown below, the area of this footprint is 401 m².
However, the Alternative 1A drawing as provided by proponent with their driveway entrance permit applications in 2014 is shown below, and the area of this footprint is 591 m².
That is, without any notice to the public, the proponent has increased the footprint of their proposed generating station by 48%.